Structural Steel Superstructure, 36-46-36 Continuous Span, Approx. Alabama Department of Transportation Date: 06/30/06 Page: 049 -10 Tabulation of Bids Call Order: 049 Contract ID: 20060526049 Counties: Clarke Letting Date: 05/26/06 10:00 AM Division: 08 Line NO / Item Code / ALT Item Description Quantity Bridge Substructure Concrete, Class A
One winning unit price
Single 1 winning bid$1,285,000/ EA
- Letting
- May 26, 2006
- Quantity
- 1 EACH
- Agency
- ALDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- May 26, 2006
- Quantity
- 1 EACH
- Contractor
- Alabama Bridge Builders, Inc.
- Winning price
- $1,285,000 / EA
What’s behind $1,285,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per EA, ranked by how much evidence each has.
- Concrete Bridge Railing Transition, Tfc$2,400391 bids
- Concrete Bridge Barrier Parapet Transition$1,800302 bids
- Concrete Bridge Railing Transition, Type Tfc$2,800123 bids
- Concrete Bridge Railing Transition, Tft$2,720109 bids
- Concrete Bridge Railing Transition, TPF-1$4,00078 bids
- Pile Tips (Steel Piles, 10 Inch)$15078 bids
- Pile Point for 10" Steel Pile$10077 bids
- Guardrail End Anchor, Type 10 Series$1,7501,685 bids
1 observation
1 agency in 1 state · lettings May 26, 2006
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.