Skip to content
Structures583I001

Steel Reinforcment for Bridge Superstructure (Grade 60) (Bridge 30)

Unit LBLettings Apr 14, 20171 agency in 1 state

One winning unit price

Single 1 winning bid

$1.05/ LB

One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
Letting
Apr 14, 2017
Quantity
7.495e+06 LB
Agency
ALDOT

Winning bids only, as awarded. Nominal dollars. How we compute this

1Winning bid
1Agency
Apr 14, 2017Letting period

Where the number comes from

One of the 1 winning bids behind that median, with the agency’s own document one click away.

Agency
ALDOT · Alabama
Letting
Apr 14, 2017
Quantity
7.495e+06 LB
Contractor
Johnsonbros.corp.a Southlandco&oscarrenda
Winning price
$1.05 / LB
Open bid tabcontract 20170331999 · lapr1417.pdf

What’s behind $1.05

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 1 bids charted, so you can see clusters and outliers.

  • 1 observations

    Agency, county, letting date, quantity and the price as printed.

  • 1 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

1 observation

1 agency in 1 state · lettings Apr 14, 2017

LettingAgency · CountyQuantityUnit priceSource document
1 rows, each with its source document. Sign in to open them.Create free account

Something wrong with this price? Report it — the form arrives knowing which item you mean.