Structures
Steel Pedestrian Bridge, Type 2, Erect over Flint River
One winning unit price
Single 1 winning bid$25,000/ EA
One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
- Letting
- Feb 2, 2018
- Quantity
- 1 Ea
- Agency
- MDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
1Winning bid
1Agency
Feb 2, 2018Letting period
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Feb 2, 2018
- Quantity
- 1 Ea
- Contractor
- Anlaan Corporation
- Winning price
- $25,000 / EA
What’s behind $25,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Create free accountHave one? Sign in
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per EA, ranked by how much evidence each has.
- Pile DRV Equip Setup ** Steel Piles$1,134462 bids
- Post Hole Through Conc for Steel Post$78.75456 bids
- Thrie Beam G.R.Bridge Conn.$1,445430 bids
- Concrete Bridge Railing Transition, Tfc$2,400391 bids
- Posts Tubular Steel 2x2-Inch x 14$190377 bids
- Concrete Bridge Barrier Parapet Transition$1,800302 bids
- Guardrail Anch, Bridge, Det M1$3,612292 bids
- Steel Pile Points$195284 bids
1 observation
1 agency in 1 state · lettings Feb 2, 2018
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
1 rows, each with its source document. Sign in to open them.Create free account