Stabilized Construction Entrance Section Totals: $5,934,415.59 $6,132,885.21 $6,267,819.00
Median winning unit price
Very thin 2 winning bids≈$15.00/ SYLow confidence
- Winning bids
- 2
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 2 winning bids behind that median, with the agency’s own document one click away.
- Agency
- SCDOT · South Carolina
- Letting
- Aug 8, 2017
- Quantity
- 550 SY
- Contractor
- C. R. Jackson, Inc.
- Winning price
- $15.00 / SY
What’s behind $15.00
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 2 bids charted, so you can see clusters and outliers.
2 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other erosion control items priced per SY, ranked by how much evidence each has.
- Stabilized Construction Entrance Section Totals: $343,099.50 $395,900.96$15.003 bids
- Stabilized Construction Entrance$16.75778 bids
- Construction Exits (Remove)$10.00395 bids
- Construction Exits (Install) (TY 1)$32.05339 bids
- Construction Geotextile for Permanent Erosion Control$3.50178 bids
- Construction Exits (Install) (TY 2)$25.0052 bids
- Construction Exits (Install) (TY 3)$25.007 bids
2 observations
1 agency in 1 state · lettings Aug 8, 2017
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.