ST. Reinf. Bar for Foundation
One winning unit price
Single 1 winning bid$0.75/ LB
- Letting
- Jul 27, 2011
- Quantity
- 12102 LB
- Agency
- WSDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- WSDOT · Kittitas, Washington
- Letting
- Jul 27, 2011
- Quantity
- 12102 LB
- Contractor
- GUY F. Atkinson Construction,
- Winning price
- $0.75 / LB
What’s behind $0.75
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per LB, ranked by how much evidence each has.
- ST. Reinf. Bar for Bridge$1.00181 bids
- ST. Reinf. Bar for Retaining Wall$1.02102 bids
- Epoxy-coated ST. Reinf. Bar for Bridge$1.2519 bids
- Epoxy-coated ST. Reinf. Bar for Retaining Wall$3.003 bids
- Reinf Steel (Bridge)$1.21813 bids
- Reinf. Steel for Structures (Bridge)$1.25625 bids
- Bar Reinforcing Steel (Bridge)$2.00600 bids
- Bar Reinforcing Steel (Retaining Wall)$1.65249 bids
1 observation
1 agency in 1 state · lettings Jul 27, 2011
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.