Solid Traffic Stripe Removed (Tape)
Median winning unit price
Moderate 7 winning bids≈$1.00/ MLow confidence
- Winning bids
- 7
- Source documents
- 4
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 7 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- May 30, 2014
- Quantity
- 210 M
- Contractor
- Midsouth Paving, Inc.
- Winning price
- $6.96 / M
Median by quarter
EstimatorHow this item has priced over time, quarter by quarter, from the same rows as the headline figure.
See what Estimator addsWhat’s behind $1.00
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 7 bids charted, so you can see clusters and outliers.
7 observations
Agency, county, letting date, quantity and the price as printed.
4 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other traffic items priced per M, ranked by how much evidence each has.
- Solid Traffic Stripe Removed (Paint)$3.009 bids
- Solid Traffic Stripe Removed (Plastic)$2.505 bids
- Solid Temporary Traffic Stripe (Tape)$4.094 bids
- Solid White, Class 3W, Type A Traffic Stripe (150 Mm Wide)$12.4638 bids
- Solid Yellow, Class 3W, Type A Traffic Stripe (150 Mm Wide)$13.4328 bids
- Solid White, Class W, Type A Traffic Stripe (125mm Wide)$11.078 bids
- Solid White, Class 3W, Type A Traffic Stripe$12.005 bids
- Solid Yellow, Class 3W, Type A Traffic Stripe$14.805 bids
7 observations
1 agency in 1 state · lettings Aug 27, 1999 – May 30, 2014
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.