Drainage
Row Drainage Basin
One winning unit price
Single 1 winning bid$530/ EA
One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
- Letting
- Jul 13, 2018
- Quantity
- 12 Ea
- Agency
- MDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
1Winning bid
1Agency
Jul 13, 2018Letting period
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Jul 13, 2018
- Quantity
- 12 Ea
- Contractor
- Malley Construction, Inc.
- Winning price
- $530 / EA
What’s behind $530
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Create free accountHave one? Sign in
Email only — no card. Search and medians stay open without an account.
Related items
Other drainage items priced per EA, ranked by how much evidence each has.
- Temporary Drainage Inlet Protection$2502,843 bids
- Masnry Drainage Struct$2,0001,057 bids
- **" Drainage Pipe Elbow$432429 bids
- Drainage Inlet Marker$76.00291 bids
- Connect into Existing Drainage Structure$1,100289 bids
- Connection to Drainage Structure$700286 bids
- Remove Drainage Structure$572274 bids
- Removing Drainage Structure$500240 bids
1 observation
1 agency in 1 state · lettings Jul 13, 2018
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
1 rows, each with its source document. Sign in to open them.Create free account