Replace Inlet Frame and Grate
One winning unit price
Single 1 winning bid$550/ EA
- Letting
- Mar 20, 2019
- Quantity
- 1 EACH
- Agency
- WSDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- WSDOT · Adams,Ferry,Pend Oreille,Stevens,Whitman, Washington
- Letting
- Mar 20, 2019
- Quantity
- 1 EACH
- Contractor
- Central Washington Asphalt, IN POE Asph
- Winning price
- $550 / EA
What’s behind $550
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other drainage items priced per EA, ranked by how much evidence each has.
- Grate Inlet Type 2$2,000260 bids
- Frame W/Grate 840.22 STD$57280 bids
- Grate Inlet Type 1$1,82572 bids
- Erosion Control, Inlet Protection, Fabric Drop$1102,971 bids
- Temporary Drainage Inlet Protection$2502,843 bids
- Inlet Protection Type A$1152,377 bids
- Inlet Protection Type C$60.001,934 bids
- Inlet Protection Type B$71.501,871 bids
1 observation
1 agency in 1 state · lettings Mar 20, 2019
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.