Removing Stumps, 8" to 18"
One winning unit price
Single 1 winning bid$108/ EA
- Letting
- Feb 6, 2015
- Quantity
- 5 Ea
- Agency
- MDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Feb 6, 2015
- Quantity
- 5 Ea
- Contractor
- Hoffman Bros., Inc.
- Winning price
- $108 / EA
What’s behind $108
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other other items priced per EA, ranked by how much evidence each has.
- 18" Roadway Pipe End Treatment, Class 1$741964 bids
- Removing Structure over Waterway$56,000854 bids
- Removing Pull Boxes$105770 bids
- Stump, Rem, 6 Inch to 18 Inch$145672 bids
- Removing (Item Description) 01.$500633 bids
- Removing Structure (Structure) 01.$9,498377 bids
- Removing Surface Drains$331342 bids
- Bracket, Truss, with 18 Foot Arm$1,328341 bids
1 observation
1 agency in 1 state · lettings Feb 6, 2015
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.