Removing Mailboxes (Including Reset with a New 2 Inch Metal or 4 Inch Timber Post) Alabama Department of Transportation Date: 11/10/08 Page: 044 -3 Tabulation of Bids Call Order: 044 Contract ID: 20081107044 Counties: Calhoun Letting Date: 11/07/08 10:00 AM Division: 04 Line NO / Item Code / ALT Item Description Quantity
One winning unit price
Single 1 winning bid$150/ EA
- Letting
- Nov 7, 2008
- Quantity
- 29 EACH
- Agency
- ALDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Nov 7, 2008
- Quantity
- 29 EACH
- Contractor
- Walker Patton Company, Inc.
- Winning price
- $150 / EA
What’s behind $150
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per EA, ranked by how much evidence each has.
- Removing Guide Post$6.25299 bids
- Removing Guardrail End Anchor (Type 10)$175280 bids
- Replace Timber Post W/O Conc FND$50.00107 bids
- Replace Timber Post W/ Conc FND$55.0084 bids
- Removing Guardrail End Anchor (All Type)$2751,880 bids
- Guardrail End Anchor, Type 10 Series$1,7501,685 bids
- Post, Mailbox$1001,577 bids
- Flexible Guide Post$32.001,367 bids
1 observation
1 agency in 1 state · lettings Nov 7, 2008
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.