Structures206D005M
Removing Gutter Unclassified Excavation Borrow Excavation (Loose Truckbed Measurement)(A-4(0) or Better) Structure Excavation Foundation Backfill, Commercial
One winning unit price
Single 1 winning bid$25.00/ M
One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
- Letting
- Apr 2, 2004
- Quantity
- 229 M
- Agency
- ALDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
1Winning bid
1Agency
Apr 2, 2004Letting period
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Apr 2, 2004
- Quantity
- 229 M
- Contractor
- DRM Utilities, LLC
- Winning price
- $25.00 / M
What’s behind $25.00
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Create free accountHave one? Sign in
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per M, ranked by how much evidence each has.
- Removing Curb and Gutter Unclassified Excavation Borrow Excavation (A4 or Better) Structure Excavation Foundation Backfill, Commercial$6.503 bids
- Removing Fence Unclassified Excavation Borrow Excavation Borrow Excavation (A4 or Better) Structure Excavation Foundation Backfill, Commercial$5.804 bids
- Removing Curb and Gutter Unclassified Excavation Borrow Excavation Structure Excavation Foundation Backfill, Commercial Unclassified Bridge Excavation$11.933 bids
- Removing Pipe Unclassified Excavation Borrow Excavation Structure Excavation Foundation Backfill, Commercial$32.807 bids
- Removing Curb and Gutter Unclassified Excavation Structure Excavation Foundation Backfill, Commercial Lime Sink Excavation$8.253 bids
- Removing Pipe Unclassified Excavation Borrow Excavation Structure Excavation Foundation Backfill, Commercial Treatment of Hydrocarbon Contaminated Soil (Specialty Item)$13.123 bids
- Removing Pipe Unclassified Excavation Structure Excavation Foundation Backfill, Commercial$10.005 bids
- Removing Fence Structure Excavation Foundation Backfill, Local$4.624 bids
1 observation
1 agency in 1 state · lettings Apr 2, 2004
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
1 rows, each with its source document. Sign in to open them.Create free account