Removal of Pipe (15" Cmp, Claude Tucker 41+64.45)
One winning unit price
Single 1 winning bid$50.00/ LF
- Letting
- Mar 29, 2019
- Quantity
- 27 LF
- Agency
- TDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- TDOT · Obion, Tennessee
- Letting
- Mar 29, 2019
- Quantity
- 27 LF
- Contractor
- Ford Construction Company
- Winning price
- $50.00 / LF
What’s behind $50.00
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other drainage items priced per LF, ranked by how much evidence each has.
- 15" Drainage Pipe$55.00561 bids
- 15" RC Pipe Culv III$57.34419 bids
- 15" Side Drain Pipe$41.74403 bids
- 15" CS Pipe Culv 0.064"$55.50344 bids
- Culvert Pipe Corrugated Steel 15$53.0097 bids
- 15" Side Drain Pipe (Class 3 R.C.)$42.6292 bids
- Culvert Pipe Temporary 15-Inch$60.3753 bids
- Culvert Pipe Class Iii-a 15-Inch$45.0037 bids
1 observation
1 agency in 1 state · lettings Mar 29, 2019
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.