Removal & Disposal of Existing Bridge 03
Median lump-sum amount
Very thin 2 winning bids≈$32,029per contractLow confidence
- Winning bids
- 2
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 2 winning bids behind that median, with the agency’s own document one click away.
- Agency
- SCDOT · South Carolina
- Letting
- May 12, 2015
- Quantity
- 1 LS
- Contractor
- Hri, Inc., DBA HRI Bridge Company
- Winning price
- $34,058 / LS
What’s behind $32,029
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 2 bids charted, so you can see clusters and outliers.
2 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per LS, ranked by how much evidence each has.
- Removal & Disposal of Existing Bridge$100,000634 bids
- Removal & Disposal of Designated Portions of Existing Bridge$70,00073 bids
- Removal of Existing Bridge Structure (Site NO. 1)$32,500277 bids
- Removal of Existing Bridge Structure (Site NO. 2)$35,27080 bids
- Removal of Existing Bridge Structure (Site NO. 3)$31,68240 bids
- Removal of Existing Bridge Structure (Site NO. 4)$30,55022 bids
- Removal of Existing Bridge Structure (Site NO. 5)$36,00019 bids
- Disposal of Cleaning Waste Hazardous Bridge No. 03$4,50011 bids
2 observations
1 agency in 1 state · lettings May 12, 2015
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.