Pile Point for 18" Prestr. Conc. Pile
One winning unit price
Single 1 winning bid$270/ EA
- Letting
- Oct 25, 2006
- Quantity
- 106 EA
- Agency
- VDOT (Richmond (4))
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- VDOT (Richmond (4)) · Charles City, Virginia
- Letting
- Oct 25, 2006
- Quantity
- 106 EA
- Contractor
- SKANSKA USA CIVIL SOUTHEAST, INC.
- Winning price
- $270 / EA
What’s behind $270
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per EA, ranked by how much evidence each has.
- Pile Point, Steel$125201 bids
- Pile Point for 12" Steel Pile$12091 bids
- Pile Point for 10" Steel Pile$10077 bids
- Posts Wood 4x6-Inch x 18-FT$80.001,298 bids
- Pile Points$125607 bids
- Pile Driving Set-up$1,500475 bids
- Pile DRV Equip Setup ** Steel Piles$1,134462 bids
- Post Hole Through Conc for Steel Post$78.75456 bids
1 observation
1 agency in 1 state · lettings Oct 25, 2006
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.