One winning unit price
Single 1 winning bid$146/ SY
- Letting
- Sep 14, 2021
- Quantity
- 325 SY
- Agency
- SCDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- SCDOT · South Carolina
- Letting
- Sep 14, 2021
- Quantity
- 325 SY
- Contractor
- Walker Brothers, Inc.
- Winning price
- $146 / SY
What’s behind $146
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other other items priced per SY, ranked by how much evidence each has.
- Pedestrian Ramp Construction$1501,578 bids
- Construction Geotextile for Separation$2.30189 bids
- Temporary Accessible Pedestrian Path$10088 bids
- Temporary Construction Roadway$50.0071 bids
- Construction Geotextile for Ditch Lining$2.5051 bids
- Polyethylene Sheeting (10 Mil.)$4.9744 bids
- Optional Base, Base Group 02$50.1234 bids
- Qc/Qa-pccp, 10 in.$63.0029 bids
1 observation
1 agency in 1 state · lettings Sep 14, 2021
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.