NS Bridge Superstructure 12" Elastic Inclusion 12" Elastic Inclusion
One winning unit price
Single 1 winning bid$124/ SY
- Letting
- Dec 21, 2011
- Quantity
- 36 SY
- Agency
- VDOT (Bristol (1))
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- VDOT (Bristol (1)) · Scott, Virginia
- Letting
- Dec 21, 2011
- Quantity
- 36 SY
- Contractor
- ESTES BROS. CONST., INC.
- Winning price
- $124 / SY
What’s behind $124
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per SY, ranked by how much evidence each has.
- NS Bridge Superstructure Elastic Inclusion 12"$1914 bids
- NS Bridge Superstructure Elastic Inclusion 16"$1989 bids
- NS Bridge Superstructure Elastic Inclusion 10"$1918 bids
- NS Bridge Superstructure Elastic Inclusion 10" Elastic Inclusion 10"$2007 bids
- NS Bridge Superstructure Elastic Inclusion 15"$2547 bids
- NS Bridge Superstructure Elastic Inclusion 10" Attd$1506 bids
- NS Bridge Superstructure Elastic Inclusion 14"$1405 bids
- NS Bridge Superstructure Elastic Inclusion$2654 bids
1 observation
1 agency in 1 state · lettings Dec 21, 2011
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|