Skip to content
Structures401SX20-0007

NS Bridge Substructure Reinforcing Steel Drilled Shafts

Unit LBLettings Nov 14, 2018 – Aug 25, 20211 agency in 1 state

Median winning unit price

Thin 3 winning bids

≈$1.30/ LBLow confidence

Treat this as a rough guide. Only 3 winning bids on record — we want 12 or more before calling a figure a median.
Winning bids
3
Source documents
3

Winning bids only, as awarded. Nominal dollars. How we compute this

3Winning bids
1Agency
Nov 14, 2018 – Aug 25, 2021Letting period

Where the number comes from

One of the 3 winning bids behind that median, with the agency’s own document one click away.

Agency
VDOT (Lynchburg (3)) · Cumberland, Virginia
Letting
Aug 25, 2021
Quantity
25360 LB
Contractor
BURLEIGH CONSTRUCTION CO.,INC
Winning price
$2.20 / LB
Open the source pagecontract C0000111282B24 · bidtabs.vdot.virginia.gov

What’s behind $1.30

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 3 bids charted, so you can see clusters and outliers.

  • 3 observations

    Agency, county, letting date, quantity and the price as printed.

  • 3 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

Who let the work, and how agencies and states compare

Estimator

The median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.

See what Estimator adds

3 observations

1 agency in 1 state · lettings Nov 14, 2018 – Aug 25, 2021

LettingAgency · CountyQuantityUnit priceSource document
3 rows, each with its source document. Sign in to open them.Create free account

Something wrong with this price? Report it — the form arrives knowing which item you mean.