NS BR. Substr. Wid./Repair Hydraulic Cement Grout Plan
One winning unit price
Single 1 winning bid$250/ CY
- Letting
- Apr 23, 2002
- Quantity
- 348 CY
- Agency
- VDOT (Salem (2))
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- VDOT (Salem (2)) · Montgomery, Virginia
- Letting
- Apr 23, 2002
- Quantity
- 348 CY
- Contractor
- BURLEIGH CONSTRUCTION CO., INC.
- Winning price
- $250 / CY
What’s behind $250
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other paving items priced per CY, ranked by how much evidence each has.
- Portland Cement Grout$36818 bids
- Structure Backfill (Slurry Cement)$429145 bids
- Cement Mortar Flowable Backfill, Mix 1$338121 bids
- Cement Conc. Pavement$272108 bids
- Material for Portland Cement Concrete Overlay (Set Price)$25096 bids
- Cement Mortar Flowable Backfill, Mix 4$37065 bids
- Cement Mortar Flowable Backfill, Mix 3$36864 bids
- Slope Paving Repair Crushed$12559 bids
1 observation
1 agency in 1 state · lettings Apr 23, 2002
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.