Traffic6573105
Modification of Overhead Sign Structure No.(____) 001
Median winning unit price
Very thin 2 winning bids≈$34,000/ EALow confidence
Treat this as a rough guide. Only 2 winning bids on record — we want 12 or more before calling a figure a median.
- Winning bids
- 2
- Source documents
- 2
Winning bids only, as awarded. Nominal dollars. How we compute this
2Winning bids
1Agency
Jan 9, 2024 – Feb 10, 2026Letting period
Where the number comes from
One of the 2 winning bids behind that median, with the agency’s own document one click away.
- Agency
- SCDOT · South Carolina
- Letting
- Feb 10, 2026
- Quantity
- 10 EA
- Contractor
- W.m. Roebuck, Incorporated
- Winning price
- $18,000 / EA
What’s behind $34,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 2 bids charted, so you can see clusters and outliers.
2 observations
Agency, county, letting date, quantity and the price as printed.
2 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Create free accountHave one? Sign in
Email only — no card. Search and medians stay open without an account.
Related items
Other traffic items priced per EA, ranked by how much evidence each has.
- Steel Overhead Sign Structure (________________)$69,300180 bids
- Remove Existing 1 Post Sign Structure$300306 bids
- Sign Cover$20.003,687 bids
- Removing Small Sign Supports$25.003,429 bids
- Sign, Type Iii, Rem$18.002,695 bids
- Construction Sign, a$1652,693 bids
- Portable Sequential Arrow and Chevron Sign Unit$2,4382,041 bids
- Road Closure Sign Assembly$2731,933 bids
2 observations
1 agency in 1 state · lettings Jan 9, 2024 – Feb 10, 2026
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
2 rows, each with its source document. Sign in to open them.Create free account