Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Date: 09/22/14 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job 040646 Letting Date: 09/17/14 HSIP-0072(43) County: Washington Job Name: Crawford CO. Line-fayetteville (Sel. Secs.) (Cable Median BA Length: 2.719 Miles Routes: 49 & 71B Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid Total Bid + Days Bid * $6,000) 1 TIME20 Time Striping, Inc. $ 829,734.01 15 $ 919,734.01 2 COLL10 Collins & Hermann, Inc. $ 1,195,531.64 15 $ 1,285,531.64 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 TIME20 Time Striping, Inc. $ 829,734.01 100.0000% 2 COLL10 Collins & Hermann, Inc. $ 1,195,531.64 144.0861%
One winning bid
Single 1 winning bid$228,000per contract
- Letting
- Sep 17, 2014
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Monroe, Arkansas
- Letting
- Sep 17, 2014
- Quantity
- 1 L.S.
- Contractor
- Simco, Inc.
- Winning price
- $228,000 / LS
What’s behind $228,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other street lighting items priced per LS, ranked by how much evidence each has.
- Illumination System NO. 1$46,50052 bids
- Additional High-tension Cable Barrier Components$10,00045 bids
- Check Cable Tension$8,00045 bids
- Illumination System NO. 2$41,40035 bids
- Modifying Interconnection Conduit and Cable$60,70033 bids
- Illumination System NO. 3$25,44228 bids
- Cable Barrier System, Type TL-4 Spare Parts$11,50026 bids
- Interconnection Conduit and Cable (Ls)$61,39518 bids
1 observation
1 agency in 1 state · lettings Sep 17, 2014
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|