Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Date: 08/17/16 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job SA5642 Letting Date: 08/10/16 997 County: Poinsett Job Name: Poinsett CO. Overlay & Pav. Markings (Sel. Secs.)(S) Length: 2.000 Miles Routes: Various Total % over Rank Vendor No./Name Bid Low Bid 1 ATLA10 Atlas Asphalt, Inc. $ 211,934.22 100.0000% 2 ASPH22 Asphalt Producers, LLC $ 231,626.00 109.2915% 3 SUGGC10 Sugg Construction, Inc. $ 262,734.52 123.9698%
One winning bid
Single 1 winning bid$6,000per contract
- Letting
- Aug 10, 2016
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Montgomery, Arkansas
- Letting
- Aug 10, 2016
- Quantity
- 1 L.S.
- Contractor
- Montgomery County
- Winning price
- $6,000 / LS
What’s behind $6,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other traffic items priced per LS, ranked by how much evidence each has.
- Construction Area Signs$12,0004,988 bids
- Maintaining Existing Traffic Management System Elements During Construction$2,5001,689 bids
- Painted Pavement Markings, Final$25,409413 bids
- Referencing Existing Pavement Markings$7,845166 bids
- Transportation of Salvageable Signal Equipment$1,500146 bids
- Cantilever Sign Structure NO. 1$52,086121 bids
- Sign Bridge NO. 1$125,00095 bids
- Bridge Mounted Sign Bracket NO. 1$10,00080 bids
1 observation
1 agency in 1 state · lettings Aug 10, 2016
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.