Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Date: 05/07/12 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job SA3450 Letting Date: 05/02/12 (Code 9970) County: Jackson Job Name: Cache River Piling Removal (S) Length: NO Project Length Routes: CR 51 Total % over Rank Vendor No./Name Bid Low Bid 1 KESS10 Kesser International, Inc. $ 16,844.96 100.0000% 2 HUNT05 a. G. Hunt Const. Co., Inc. $ 69,980.00 415.4358% 3 MOBL10 Mobley Contractors, Inc. $ 89,745.75 532.7751% 4 IDEA10 Ideal Construction Company $ 372,170.00 2,209 %
One winning bid
Single 1 winning bid$5,700per contract
- Letting
- May 2, 2012
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Garland, Arkansas
- Letting
- May 2, 2012
- Quantity
- 1 L.S.
- Contractor
- Martin Marietta Materials, Inc.
- Winning price
- $5,700 / LS
What’s behind $5,700
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per LS, ranked by how much evidence each has.
- Removal of Old Bridge, Partial, Station 100+00.00$117,00012 bids
- Removal of Old Bridge, Station 12+50.00$10,0007 bids
- Removal of Existing Bridge Structure (Site NO. 1)$32,500277 bids
- Surface Seal, Bridge No. 02$6,107127 bids
- Removal of Existing Bridge Structure (Site NO. 2)$35,27080 bids
- Surface Seal, Bridge No. 05$5,32257 bids
- Removal of Existing Bridge Structure (Site NO. 3)$31,68240 bids
- Present Structure, Remove Portions, Bridge No. 02$120,00038 bids
1 observation
1 agency in 1 state · lettings May 2, 2012
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.