Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Date: 04/22/13 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job 012179 Letting Date: 04/17/13 ACHSIP-4373(1) County: Lonoke & White Job Name: Cabot-bald Knob (Sel. Secs.) (Cable Median Barrier) (S) Length: 33.592 Miles Routes: 67 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $6,000) 1 KIEW15 Kiewit Infrastructure South CO. $ 5,301,246.07 45 $ 5,571,246.67 2 COLL10 Collins & Hermann, Inc. $ 5,149,676.67 103 $ 5,767,676.67 3 KING15 Kingridge Enterprises, Inc. $ 5,466,908.89 120 $ 6,186,908.89 4 WEAV10 Weaver-bailey Contrs., Inc. $ 5,585,071.04 130 $ 6,365,071.04 5 NATI23 Nationwide Construction Group $ 5,666,232.21 125 $ 6,416,232.21 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 KIEW15 Kiewit Infrastructure South CO. $ 5,301,246.07 100.0000% 2 COLL10 Collins & Hermann, Inc. $ 5,149,676.67 97.1409% 3 KING15 Kingridge Enterprises, Inc. $ 5,466,908.89 103.1250% 4 WEAV10 Weaver-bailey Contrs., Inc. $ 5,585,071.04 105.3539% 5 NATI23 Nationwide Construction Group $ 5,666,232.21 106.8849%
One winning bid
Single 1 winning bid$55,000per contract
- Letting
- Apr 17, 2013
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Poinsett, Arkansas
- Letting
- Apr 17, 2013
- Quantity
- 1 L.S.
- Contractor
- Atlas Asphalt, Inc.
- Winning price
- $55,000 / LS
What’s behind $55,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other street lighting items priced per LS, ranked by how much evidence each has.
- Additional High-tension Cable Barrier Components$10,00045 bids
- Cable Barrier System, Type TL-4 Spare Parts$11,50026 bids
- Construction Staking Electrical$1,850551 bids
- Illumination System NO. 1$46,50052 bids
- Check Cable Tension$8,00045 bids
- Illumination System NO. 2$41,40035 bids
- Modifying Interconnection Conduit and Cable$60,70033 bids
- Illumination System NO. 3$25,44228 bids
1 observation
1 agency in 1 state · lettings Apr 17, 2013
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.