Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Date: 03/31/16 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job BB0413 Letting Date: 03/23/16 NHPP-540-1(76)73 County: Washington Job Name: Elm Springs RD. Intchng. Impvts. (F) Length: 0.253 Miles Routes: 49 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $14,000) 1 MANH10 Manhattan Road & Bridge CO. $ 6,260,081.42 140 $ 8,220,081.42 2 CROS15 Crossland Heavy Contr., Inc. $ 7,187,299.00 160 $ 9,427,299.00 3 KIEW15 Kiewit Infrastructure South CO. $ 8,268,074.09 100 $ 9,668,074.09 4 MOBL10 Mobley Contractors, Inc. $ 7,763,544.48 320 $12,243,544.48 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 MANH10 Manhattan Road & Bridge CO. $ 6,260,081.42 100.0000% 2 CROS15 Crossland Heavy Contr., Inc. $ 7,187,299.00 114.8116% 3 KIEW15 Kiewit Infrastructure South CO. $ 8,268,074.09 132.0761% 4 MOBL10 Mobley Contractors, Inc. $ 7,763,544.48 124.0167%
One winning bid
Single 1 winning bid$2,500per contract
- Letting
- Mar 23, 2016
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Hempstead, Arkansas
- Letting
- Mar 23, 2016
- Quantity
- 1 L.S.
- Contractor
- Redstone Const. Group, Inc.
- Winning price
- $2,500 / LS
What’s behind $2,500
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per LS, ranked by how much evidence each has.
- Removal of Existing Bridge Structure (Site NO. 1)$32,500277 bids
- Surface Seal, Bridge No. 03$5,30083 bids
- Removal of Existing Bridge Structure (Site NO. 2)$35,27080 bids
- Removal of Existing Bridge Structure (Site NO. 3)$31,68240 bids
- Surface Seal, Bridge No. 09$6,51024 bids
- Epoxy Injection, Furnishing Equipment, Bridge No. 03$97222 bids
- Removal of Existing Bridge Structure (Site NO. 4)$30,55022 bids
- Present Structure, Remove Portions, Bridge No. 03$70,54520 bids
1 observation
1 agency in 1 state · lettings Mar 23, 2016
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.