Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Date: 03/12/10 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job 040026 Letting Date: 03/10/10 BRO-0017(17) County: Crawford Job Name: Hurricane CR. & Couch Branch Strs. & Apprs. (S) Length: 0.19 Miles Routes: 282 Total % over Rank Vendor No./Name Bid Low Bid 1 TNTI10 T-n-t, Inc. $ 799,863.40 100.0000% 2 CRAW10 Crawford Construction CO. $ 823,352.15 102.9366% 3 BEAM10 Steve Beam Construction CO. $ 834,129.77 104.2840% 4 FORS10 Forsgren, Inc. $ 958,351.03 119.8143% 5 MANH10 Manhattan Road & Bridge CO. $ 1,068,111.06 133.5367%
One winning bid
Single 1 winning bid$335,000per contract
- Letting
- Mar 10, 2010
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Hempstead Lafayette, Arkansas
- Letting
- Mar 10, 2010
- Quantity
- 1 L.S.
- Contractor
- Martin Marietta Materials, Inc.
- Winning price
- $335,000 / LS
What’s behind $335,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per LS, ranked by how much evidence each has.
- Surface Seal, Bridge No. 03$5,30083 bids
- Surface Seal, Bridge No. 06$8,36047 bids
- Surface Seal, Bridge No. 10$6,45830 bids
- Epoxy Injection, Furnishing Equipment, Bridge No. 03$97222 bids
- Present Structure, Remove Portions, Bridge No. 03$70,54520 bids
- Surface Seal, Bridge No. 12$5,15517 bids
- Epoxy Injection, Furnishing Equipment, Bridge No. 06$88816 bids
- Clean Steel Bridge, QP-2, Bridge No. 06$93,61515 bids
1 observation
1 agency in 1 state · lettings Mar 10, 2010
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.