Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Cost Plus Time Totals Date: 01/19/16 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job BB0611 Letting Date: 01/13/16 NHPP-440-1(7)0 County: Pulaski Job Name: Bankhead Dr.-Ark. River Bridge (S) Length: 2.815 Miles Routes: 440 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $35,000) 1 KIEW15 Kiewit Infrastructure South CO. $ 33,796,319.60 220 $ 41,496,319.60 2 CONT17 Conti Enterprises, Inc. $ 38,685,975.00 373 $ 51,740,975.00 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 KIEW15 Kiewit Infrastructure South CO. $ 33,796,319.60 100.0000% 2 CONT17 Conti Enterprises, Inc. $ 38,685,975.00 114.4680%
One winning bid
Single 1 winning bid$697,500per contract
- Letting
- Jan 13, 2016
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · White, Arkansas
- Letting
- Jan 13, 2016
- Quantity
- 1 L.S.
- Contractor
- Bobby Kennedy Construction CO.
- Winning price
- $697,500 / LS
What’s behind $697,500
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per LS, ranked by how much evidence each has.
- Removal of Existing Bridge Structure (Site NO. 1)$32,500277 bids
- Surface Seal, Bridge No. 01$6,000139 bids
- Removal of Existing Bridge Structure (Site NO. 2)$35,27080 bids
- Present Structure, Remove Portions, Bridge No. 01$100,00043 bids
- Removal of Existing Bridge Structure (Site NO. 3)$31,68240 bids
- Epoxy Injection, Furnishing Equipment, Bridge No. 01$97224 bids
- Present Structure, Remove, Bridge No. 01$122,75022 bids
- Removal of Existing Bridge Structure (Site NO. 4)$30,55022 bids
1 observation
1 agency in 1 state · lettings Jan 13, 2016
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.