Street Lighting601001LS · lump sum

Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Cost Plus Time Totals Date: 01/14/13 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job 012168 Letting Date: 01/09/13 HSIP-40-1(263)1 County: Crawford Johnson Job Name: Okla. ST. Line-lamar (Sel. Secs.) (Cable Median Barrier) (S) Length: 27.257 Miles Routes: 40 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $6,000) 1 MASS25 Massana Construction, Inc. $ 4,286,225.50 79 $ 4,760,225.50 2 COLL10 Collins & Hermann, Inc. $ 4,760,404.04 119 $ 5,474,404.04 3 KIEW15 Kiewit Infrastructure South CO. $ 5,186,904.01 50 $ 5,486,904.01 4 FORS10 Forsgren, Inc. $ 4,746,979.01 155 $ 5,676,979.01 5 NATI23 Nationwide Construction Group $ 5,201,917.21 165 $ 6,191,917.21 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 MASS25 Massana Construction, Inc. $ 4,286,225.50 100.0000% 2 COLL10 Collins & Hermann, Inc. $ 4,760,404.04 111.0628% 3 KIEW15 Kiewit Infrastructure South CO. $ 5,186,904.01 121.0133% 4 FORS10 Forsgren, Inc. $ 4,746,979.01 110.7496% 5 NATI23 Nationwide Construction Group $ 5,201,917.21 121.3636%

Unit LS (lump sum, one per contract)Lettings Jan 9, 20131 agency in 1 state

LSPriced per contract — not a unit price

One winning bid

Single 1 winning bid

$120,000per contract

One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
Letting
Jan 9, 2013
Quantity
1 L.S.
Agency
ARDOT

Winning bids only, as awarded. Nominal dollars. How we compute this

1Winning bid
1Agency
Jan 9, 2013Letting period

Where the number comes from

One of the 1 winning bids behind that median, with the agency’s own document one click away.

Agency
ARDOT · Craighead Poinsett, Arkansas
Letting
Jan 9, 2013
Quantity
1 L.S.
Contractor
Collins & Hermann, Inc.
Winning price
$120,000 / LS
Open bid tabcontract 100768 · Jan-13-Bid_Tabs.pdf

What’s behind $120,000

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 1 bids charted, so you can see clusters and outliers.

  • 1 observations

    Agency, county, letting date, quantity and the price as printed.

  • 1 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

Who let the work, and how agencies and states compare

Estimator

The median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.

See what Estimator adds

1 observation

1 agency in 1 state · lettings Jan 9, 2013

LettingAgency · CountyQuantityUnit priceSource document
1 rows, each with its source document. Sign in to open them.Create free account

Something wrong with this price? Report it — the form arrives knowing which item you mean.