Skip to content
General Conditions601001LS · lump sum

Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Cost Plus Time Totals Date: 03/04/13 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job BB0806 Letting Date: 02/27/13 BIM-B40-0(225)&HSIP-40-3(133)9 County: Conway Pope Job Name: Atkins-plumerville (S) Length: 18.587 Miles Routes: 40 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $19,000) 1 ROGE02 Rogers Group, Inc. $ 12,350,633.42 90 $ 14,060,633.42 2 REDS10 Redstone Const. Group, Inc. $ 13,107,044.59 55 $ 14,152,044.59 3 BLAC30 Blackstone Construction, LLC $ 13,249,970.68 80 $ 14,769,970.68 4 KIEW15 Kiewit Infrastructure South CO. $ 16,063,114.66 41 $ 16,842,114.66 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 ROGE02 Rogers Group, Inc. $ 12,350,633.42 100.0000% 2 REDS10 Redstone Const. Group, Inc. $ 13,107,044.59 106.1248% 3 BLAC30 Blackstone Construction, LLC $ 13,249,970.68 107.2817% 4 KIEW15 Kiewit Infrastructure South CO. $ 16,063,114.66 130.0590%

Unit LS (lump sum, one per contract)Lettings Feb 27, 20131 agency in 1 state

LSPriced per contract — not a unit price

One winning bid

Single 1 winning bid

$992,000per contract

One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
Letting
Feb 27, 2013
Quantity
1 L.S.
Agency
ARDOT

Winning bids only, as awarded. Nominal dollars. How we compute this

1Winning bid
1Agency
Feb 27, 2013Letting period

Where the number comes from

One of the 1 winning bids behind that median, with the agency’s own document one click away.

Agency
ARDOT · White, Arkansas
Letting
Feb 27, 2013
Quantity
1 L.S.
Contractor
Koss Construction CO.
Winning price
$992,000 / LS
Open bid tabcontract 050260 · Feb-13-Bid_Tabs.pdf

What’s behind $992,000

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 1 bids charted, so you can see clusters and outliers.

  • 1 observations

    Agency, county, letting date, quantity and the price as printed.

  • 1 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

Who let the work, and how agencies and states compare

Estimator

The median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.

See what Estimator adds

1 observation

1 agency in 1 state · lettings Feb 27, 2013

LettingAgency · CountyQuantityUnit priceSource document
1 rows, each with its source document. Sign in to open them.Create free account