Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Cost Plus Time Totals Date: 12/22/14 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job 061277 Letting Date: 12/17/14 EBS-9253(65) County: Pulaski Job Name: Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (Lr) (S) Length: 0.481 Miles Routes: 70 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $4,000) 1 JAME20 James Construction Group, LLC $ 10,618,035.94 138 $ 11,170,035.94 2 MANH10 Manhattan Road & Bridge CO. $ 10,425,341.72 234 $ 11,361,341.72 3 MOBL10 Mobley Contractors, Inc. $ 10,913,762.14 260 $ 11,953,762.14 4 JENS10 Jensen Construction CO. $ 11,990,596.61 225 $ 12,890,596.61 5 CENT25 Century Construction & Realty, Inc. $ 13,581,744.99 400 $ 15,181,744.99 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 JAME20 James Construction Group, LLC $ 10,618,035.94 100.0000% 2 MANH10 Manhattan Road & Bridge CO. $ 10,425,341.72 98.1852% 3 MOBL10 Mobley Contractors, Inc. $ 10,913,762.14 102.7851% 4 JENS10 Jensen Construction CO. $ 11,990,596.61 112.9267% 5 CENT25 Century Construction & Realty, Inc. $ 13,581,744.99 127.9120%
One winning bid
Single 1 winning bid$885,000per contract
- Letting
- Dec 17, 2014
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Fulton, Arkansas
- Letting
- Dec 17, 2014
- Quantity
- 1 L.S.
- Contractor
- Pace Construction Co., LLC
- Winning price
- $885,000 / LS
What’s behind $885,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per LS, ranked by how much evidence each has.
- Removal of Existing Bridge Structure (Site NO. 1)$32,500277 bids
- Removal of Existing Bridge Structure (Site NO. 2)$35,27080 bids
- Removal of Existing Bridge Structure (Site NO. 3)$31,68240 bids
- Surface Seal, Bridge No. 10$6,45830 bids
- Surface Seal, Bridge No. 11$6,60126 bids
- Removal of Existing Bridge Structure (Site NO. 4)$30,55022 bids
- Removal of Existing Bridge Structure (Site NO. 5)$36,00019 bids
- Surface Seal, Bridge No. 12$5,15517 bids
1 observation
1 agency in 1 state · lettings Dec 17, 2014
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.