Skip to content
Paving601001LS · lump sum

Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Cost Plus Time Totals Date: 09/22/14 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job BB1006 Letting Date: 09/17/14 BIM-PEN-B55-0(209) County: Mississippi Job Name: NO. Of Hwy. 18-Missouri ST. Line (S) Length: 4.177 Miles Routes: 55 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $12,000) 1 DELT10 Delta Asphalt of Ark., Inc. $ 25,362,155.61 140 $ 27,042,155.61 2 BROS10 Chester Bross Const. CO. $ 27,605,397.22 190 $ 29,885,397.22 3 LEHM10 Lehman-roberts Company $ 33,733,974.64 215 $ 36,313,974.64 4 KOSS10 Koss Construction CO. $ 35,101,271.15 175 $ 37,201,271.15 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 DELT10 Delta Asphalt of Ark., Inc. $ 25,362,155.61 100.0000% 2 BROS10 Chester Bross Const. CO. $ 27,605,397.22 110.5141% 3 LEHM10 Lehman-roberts Company $ 33,733,974.64 134.2865% 4 KOSS10 Koss Construction CO. $ 35,101,271.15 137.5677%

Unit LS (lump sum, one per contract)Lettings Sep 17, 20141 agency in 1 state

LSPriced per contract — not a unit price

One winning bid

Single 1 winning bid

$342,000per contract

One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
Letting
Sep 17, 2014
Quantity
1 L.S.
Agency
ARDOT

Winning bids only, as awarded. Nominal dollars. How we compute this

1Winning bid
1Agency
Sep 17, 2014Letting period

Where the number comes from

One of the 1 winning bids behind that median, with the agency’s own document one click away.

Agency
ARDOT · Benton, Arkansas
Letting
Sep 17, 2014
Quantity
1 L.S.
Contractor
Apac-central, Inc.
Winning price
$342,000 / LS
Open bid tabcontract 090284 · Sep-14-Bid-_Tabs_PM.pdf

What’s behind $342,000

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 1 bids charted, so you can see clusters and outliers.

  • 1 observations

    Agency, county, letting date, quantity and the price as printed.

  • 1 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

Who let the work, and how agencies and states compare

Estimator

The median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.

See what Estimator adds

1 observation

1 agency in 1 state · lettings Sep 17, 2014

LettingAgency · CountyQuantityUnit priceSource document
1 rows, each with its source document. Sign in to open them.Create free account

Something wrong with this price? Report it — the form arrives knowing which item you mean.