Skip to content
Structures601001LS · lump sum

Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Cost Plus Time Totals Date: 09/14/12 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job 040578 Letting Date: 09/12/12 STP-9142(26) County: Washington Job Name: Armstrong Ave.-Stone Bridge Rd.(Sel. Secs.)(Fayetteville)(S) Length: 1.288 Miles Routes: 16 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $4,500) 1 SWEE10 Sweetser Construction, Inc. $ 6,212,756.93 225 $ 7,225,256.93 2 DECC10 Decco Contractors-paving, Inc. $ 6,240,696.29 225 $ 7,253,196.29 3 APAC20 Apac-central, Inc. $ 6,409,829.21 225 $ 7,422,329.21 4 NABH25 Nabholz Construction Corporation $ 6,906,359.81 225 $ 7,918,859.81 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 SWEE10 Sweetser Construction, Inc. $ 6,212,756.93 100.0000% 2 DECC10 Decco Contractors-paving, Inc. $ 6,240,696.29 100.4497% 3 APAC20 Apac-central, Inc. $ 6,409,829.21 103.1721% 4 NABH25 Nabholz Construction Corporation $ 6,906,359.81 111.1642%

Unit LS (lump sum, one per contract)Lettings Sep 12, 20121 agency in 1 state

LSPriced per contract — not a unit price

One winning bid

Single 1 winning bid

$257,900per contract

One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
Letting
Sep 12, 2012
Quantity
1 L.S.
Agency
ARDOT

Winning bids only, as awarded. Nominal dollars. How we compute this

1Winning bid
1Agency
Sep 12, 2012Letting period

Where the number comes from

One of the 1 winning bids behind that median, with the agency’s own document one click away.

Agency
ARDOT · Washington, Arkansas
Letting
Sep 12, 2012
Quantity
1 L.S.
Contractor
Apac-central, Inc.
Winning price
$257,900 / LS
Open bid tabcontract 040490 · Sep-12-Bid_Tabs.pdf

What’s behind $257,900

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 1 bids charted, so you can see clusters and outliers.

  • 1 observations

    Agency, county, letting date, quantity and the price as printed.

  • 1 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

Who let the work, and how agencies and states compare

Estimator

The median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.

See what Estimator adds

1 observation

1 agency in 1 state · lettings Sep 12, 2012

LettingAgency · CountyQuantityUnit priceSource document
1 rows, each with its source document. Sign in to open them.Create free account

Something wrong with this price? Report it — the form arrives knowing which item you mean.