Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Cost Plus Time Totals Date: 12/03/12 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job 012169 Letting Date: 11/28/12 HSIP-0472(5) County: Benton Washington Job Name: Siloam Springs-tontitown (Sel. Secs.) (Cable Median Barrier)(S) Length: 10.530 Miles Routes: 412 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $4,000) 1 EATO10 Eaton Excavating, Inc. $ 1,491,115.25 45 $ 1,671,115.25 2 CROU10 Crouse Construction CO. $ 1,602,391.00 50 $ 1,802,391.00 3 COLL10 Collins & Hermann, Inc. $ 1,702,468.24 44 $ 1,878,468.24 4 NATI23 Nationwide Construction Group $ 1,754,091.25 41 $ 1,918,091.25 5 MIDS30 Midstate Traffic Control, Inc. $ 1,974,654.00 50 $ 2,174,654.00 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 EATO10 Eaton Excavating, Inc. $ 1,491,115.25 100.0000% 2 CROU10 Crouse Construction CO. $ 1,602,391.00 107.4626% 3 COLL10 Collins & Hermann, Inc. $ 1,702,468.24 114.1742% 4 NATI23 Nationwide Construction Group $ 1,754,091.25 117.6362% 5 MIDS30 Midstate Traffic Control, Inc. $ 1,974,654.00 132.4280%
One winning bid
Single 1 winning bid$300,000per contract
- Letting
- Nov 28, 2012
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Crittenden Mississippi, Arkansas
- Letting
- Nov 28, 2012
- Quantity
- 1 L.S.
- Contractor
- Massana Construction, Inc.
- Winning price
- $300,000 / LS
What’s behind $300,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other traffic items priced per LS, ranked by how much evidence each has.
- Removal of Existing Traffic Control Unit (Partial) (Riverchase Parkway East$5506 bids
- Furnishing and Installing Traffic Control Unit (CR-83 @ US-90)$1.155 bids
- Removal of Existing Traffic Control Unit (Partial) (Cabinet Upgrades - Cabinet, Controller, and Mmu)$3,2215 bids
- Traffic Control$25,66015,599 bids
- Traffic Control System$140,0004,474 bids
- Basic Work Zone Traffic Control$152,6662,814 bids
- Traffic Control Supervisor$5,0001,768 bids
- Maintaining Existing Traffic Management System Elements During Construction$2,5001,689 bids
1 observation
1 agency in 1 state · lettings Nov 28, 2012
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.