Skip to content
General Conditions601001LS · lump sum

Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Cost Plus Time Totals Arkansas State Highway and Transportation Department Date: 04/21/14 Page: 220 -6 Tabulation of Bids Call Order: 220 Contract ID: BB0805 Counties: Pope Letting Date: 04/16/14 2:00 P.M. District: 08 Line NO / Item Code / ALT Item Description Quantity Date: 04/21/14 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job 080489 Letting Date: 04/16/14 STP-0VLY(122) County: Perry Job Name: Saline CO. Line-north (Overlay) (S) Length: 4.800 Miles Routes: 9 Total % over Rank Vendor No./Name Bid Low Bid 1 ROGE02 Rogers Group, Inc. $ 840,080.93 100.0000% 2 CRAN20 Cranford Construction CO. $ 873,847.25 104.0194% 3 REDS10 Redstone Const. Group, Inc. $ 923,261.75 109.9015%

Unit LS (lump sum, one per contract)Lettings Apr 16, 20141 agency in 1 state

LSPriced per contract — not a unit price

One winning bid

Single 1 winning bid

$150,000per contract

One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
Letting
Apr 16, 2014
Quantity
1 L.S.
Agency
ARDOT

Winning bids only, as awarded. Nominal dollars. How we compute this

1Winning bid
1Agency
Apr 16, 2014Letting period

Where the number comes from

One of the 1 winning bids behind that median, with the agency’s own document one click away.

Agency
ARDOT · Pope, Arkansas
Letting
Apr 16, 2014
Quantity
1 L.S.
Contractor
Blackstone Construction, LLC
Winning price
$150,000 / LS
Open bid tabcontract BB0805 · Apr-14-Bid_Tabs_PM.pdf

What’s behind $150,000

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 1 bids charted, so you can see clusters and outliers.

  • 1 observations

    Agency, county, letting date, quantity and the price as printed.

  • 1 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

Who let the work, and how agencies and states compare

Estimator

The median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.

See what Estimator adds

1 observation

1 agency in 1 state · lettings Apr 16, 2014

LettingAgency · CountyQuantityUnit priceSource document
1 rows, each with its source document. Sign in to open them.Create free account