Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Cost Plus Time Totals Date: 03/16/15 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job BB0416 Letting Date: 03/10/15 NHPP-49-1(16)73 County: Washington Job Name: Elm Springs RD. Intchng. Temp. Sig. (I-49) (Springdale) (S) Length: NO Project Length Routes: 49 Total % over Rank Vendor No./Name Bid Low Bid 1 ALLS05 All Service Electric, Inc. $ 83,136.00 100.0000% 2 TRAF20 Traffic & Lighting Systems, LLC $ 98,405.00 118.3663%
One winning bid
Single 1 winning bid$636,357per contract
- Letting
- Mar 10, 2015
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Jefferson, Arkansas
- Letting
- Mar 10, 2015
- Quantity
- 1 L.S.
- Contractor
- Cranford Construction CO.
- Winning price
- $636,357 / LS
What’s behind $636,357
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other traffic items priced per LS, ranked by how much evidence each has.
- NS Traffic Signalization Traffic Signalization Temp. Signalization Int NO. 1 512$8,2007 bids
- Furnishing and Installing Traffic Control Unit (CR-83 @ US-90)$1.155 bids
- NS Traffic Signalization Traffic Signalization Temp. Signalization Int NO. 3 512$7,8005 bids
- Project Temporary Traffic Control$79,0001,343 bids
- Temp Traffic Control (Sp)$89,500475 bids
- Modifying Signal and Lighting Systems$185,000455 bids
- Temp Traffic Signals for Inter$28,500168 bids
- Temp Traffic Control$32,000126 bids
1 observation
1 agency in 1 state · lettings Mar 10, 2015
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.