Mobilization (Unit Bid Amount May Not Exceed 5% of Subtotal) Contract Totals Arkansas State Highway and Transportation Department Date: 12/03/12 Page: 050 -9 Tabulation of Bids Call Order: 050 Contract ID: BB0614 Counties: Pulaski Saline Letting Date: 11/28/12 10:00 a.M. District: 06 Line NO / Item Code / ALT Item Description Quantity Cost Plus Time Totals Date: 12/03/12 Arkansas State Highway and Transportation Department Page: 1 Bid Tabulation Summary Bids Opened for Job BB0804 Letting Date: 11/28/12 BIM-B40-0(223)&IM-HSIP-40-2(79)77 County: Pope Job Name: Mill Creek-hwy. 331 (F) Length: 7.395 Miles Routes: 40 Amount for Award Consideration (Per Job Special Provision “Site Use (A+C Method)”) Total Days Amount for Award Consideration Rank Vendor No./Name Bid Bid (Total Bid + Days Bid * $20,000) 1 BLAC30 Blackstone Construction, LLC $ 42,378,010.48 280 $ 47,978,010.48 2 KIEW15 Kiewit Infrastructure South CO. $ 47,955,347.70 125 $ 50,455,347.70 3 ROGE02 Rogers Group, Inc. $ 46,719,711.50 285 $ 52,419,711.50 4 KOSS10 Koss Construction CO. $ 48,933,866.79 250 $ 53,933,866.79 5 REDS10 Redstone Const. Group, Inc. $ 48,992,746.53 285 $ 54,692,746.53 Contract Amount Total % over Rank Vendor No./Name Bid Low Bid 1 BLAC30 Blackstone Construction, LLC $ 42,378,010.48 100.0000% 2 KIEW15 Kiewit Infrastructure South CO. $ 47,955,347.70 113.1609% 3 ROGE02 Rogers Group, Inc. $ 46,719,711.50 110.2452% 4 KOSS10 Koss Construction CO. $ 48,933,866.79 115.4699% 5 REDS10 Redstone Const. Group, Inc. $ 48,992,746.53 115.6089%
One winning bid
Single 1 winning bid$478,135per contract
- Letting
- Nov 28, 2012
- Quantity
- 1 L.S.
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Pulaski Saline, Arkansas
- Letting
- Nov 28, 2012
- Quantity
- 1 L.S.
- Contractor
- Cranford Construction CO.
- Winning price
- $478,135 / LS
What’s behind $478,135
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other paving items priced per LS, ranked by how much evidence each has.
- Clearing and Grubbing (Maximum Allowable Bid $ 10,000.00 per Hectare)(Approximately 2 Removing Concrete Driveway$20,0003 bids
- Precast Reinf. Conc. Three Sided Structure NO. 1$141,57532 bids
- Generic Paving Item (Ls)$83,19810 bids
- Precast Reinf. Conc. Three Sided Structure NO. 2$195,00010 bids
- Concrete Pavement Joint Layout 03.$1,0765 bids
- Paving Construction Allowancc$150,0004 bids
- Precast Reinf. Conc. Three Sided Structure NO. 3$136,5004 bids
- Coating Concrete Surfaces (At MP 126.000 (Bin 014155))$25,3683 bids
1 observation
1 agency in 1 state · lettings Nov 28, 2012
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.