Skip to content
Drainage610C001M

Loose Riprap, Class 2 Filter Blanket, Geotextile Alabama Department of Transportation Date: 06/29/12 Page: 014 -5 Tabulation of Bids Call Order: 014 Contract ID: 20120629014 Counties: Jefferson Letting Date: 06/29/12 10:00 AM Division: 03 Line NO / Item Code / ALT Item Description Quantity Concrete Sidewalk, 100 Mm Thick Concrete Driveway, 150 Mm Thick

Unit MTONLettings Jun 29, 20121 agency in 1 state

One winning unit price

Single 1 winning bid

$60.86/ MTON

One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
Letting
Jun 29, 2012
Quantity
548 MTON
Agency
ALDOT

Winning bids only, as awarded. Nominal dollars. How we compute this

1Winning bid
1Agency
Jun 29, 2012Letting period

Where the number comes from

One of the 1 winning bids behind that median, with the agency’s own document one click away.

Agency
ALDOT · Alabama
Letting
Jun 29, 2012
Quantity
548 MTON
Contractor
Carcel & G. Construction, LLC
Winning price
$60.86 / MTON
Open bid tabcontract 20120629014 · ljun2912.pdf

What’s behind $60.86

A free account opens the full build-up of this number, down to the agency documents it came from.

  • Middle-half range

    The p25–p75 band of winning bids — where most jobs actually land.

  • Price distribution

    All 1 bids charted, so you can see clusters and outliers.

  • 1 observations

    Agency, county, letting date, quantity and the price as printed.

  • 1 public bid tabulations

    Every row links to the agency’s own document. Check any price yourself.

Email only — no card. Search and medians stay open without an account.

1 observation

1 agency in 1 state · lettings Jun 29, 2012

LettingAgency · CountyQuantityUnit priceSource document
1 rows, each with its source document. Sign in to open them.Create free account

Something wrong with this price? Report it — the form arrives knowing which item you mean.