Structures634E000M
Industrial Fence, 1.83 M High, Special Mounting Topsoil from Stockpiles
Median winning unit price
Very thin 2 winning bids≈$124/ MLow confidence
Treat this as a rough guide. Only 2 winning bids on record — we want 12 or more before calling a figure a median.
- Winning bids
- 2
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
2Winning bids
1Agency
Dec 7, 2001Letting period
Where the number comes from
One of the 2 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Dec 7, 2001
- Quantity
- 100 M
- Contractor
- Riley Bridge & Engineering Co., Inc.
- Winning price
- $125 / M
What’s behind $124
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 2 bids charted, so you can see clusters and outliers.
2 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Create free accountHave one? Sign in
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per M, ranked by how much evidence each has.
- Barbed Wire Fence, 4 Strands, 1.22 Meter High Topsoil from Stockpiles$18.003 bids
- Industrial Fence, 1.83 Meters High$32.9524 bids
- Fence Reset (Includes All Types) Topsoil Topsoil from Stockpiles$12.007 bids
- Woven Wire Fence Topsoil Topsoil from Stockpiles$20.003 bids
- Industrial Fence, 1.22 Meters High$30.007 bids
- Barbed Wire Fence, 4 Strands, 1.22 Meter High$14.558 bids
- High Visibility Fence$9.258 bids
- Fence Reset Topsoil$20.006 bids
2 observations
1 agency in 1 state · lettings Dec 7, 2001
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
2 rows, each with its source document. Sign in to open them.Create free account