Guardrail Post, Bridge Retrofit
One winning unit price
Single 1 winning bid$345/ EA
- Letting
- Apr 3, 2020
- Quantity
- 14 Ea
- Agency
- MDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Apr 3, 2020
- Quantity
- 14 Ea
- Contractor
- Rieth-Riley Construction Co., Inc.
- Winning price
- $345 / EA
What’s behind $345
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per EA, ranked by how much evidence each has.
- Bridge Guardrail Retrofit, Type SC$5,300101 bids
- Guardrail Anch, Bridge, Det M1$3,612292 bids
- Guardrail Anch, Bridge, Det T2$1,475282 bids
- Guardrail Anch, Bridge, Det T1$1,538224 bids
- Hand Dig Guardrail Post Holes$100137 bids
- NS Guardrail Post Leave Out$75.00108 bids
- Hand Digging Guardrail Post$10092 bids
- Guardrail Anch, Bridge, Det T4$1,80089 bids
1 observation
1 agency in 1 state · lettings Apr 3, 2020
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.