Furnishing and Installing Traffic Control System (Patton Island Rd. @ Union Ave. & Huntsville Ave.)
Median lump-sum amount
Very thin 2 winning bids≈$8,460per contractLow confidence
- Winning bids
- 2
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 2 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Jun 30, 2000
- Quantity
- 1 LS
- Contractor
- S & M Equipment Co., Inc.
- Winning price
- $8,720 / LS
What’s behind $8,460
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 2 bids charted, so you can see clusters and outliers.
2 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other traffic items priced per LS, ranked by how much evidence each has.
- Furnishing and Installing Traffic Control Unit (CR-83 @ US-90)$1.155 bids
- Traffic Control System$140,0004,474 bids
- Furnishing and Installing Video Detection System$25,00053 bids
- Furnish Traffic Control Signal System Material$144,50418 bids
- Traffic Signal Control System$21,50014 bids
- Traffic Control$25,66015,599 bids
- Basic Work Zone Traffic Control$152,6662,814 bids
- Traffic Control Supervisor$5,0001,768 bids
2 observations
1 agency in 1 state · lettings Jun 30, 2000
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.