Foundation Preparation(Bridge NO. 2, Pier NO. 2, Sta. 13+45.00)
One winning bid
Single 1 winning bid$47,000per contract
- Letting
- Aug 16, 2024
- Quantity
- 1 LS
- Agency
- TDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- TDOT · Sullivan, Tennessee
- Letting
- Aug 16, 2024
- Quantity
- 1 LS
- Contractor
- Summers-taylor, Inc.
- Winning price
- $47,000 / LS
What’s behind $47,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Who let the work, and how agencies and states compare
EstimatorThe median split by developer, city and state DOT, a per-agency comparison where the counts carry it, and the median by state and county for this item.
See what Estimator addsRelated items
Other structures items priced per LS, ranked by how much evidence each has.
- Foundation Preparation Pier 1$155,00013 bids
- Foundation Preparation Pier 2$150,00012 bids
- Surface Seal, Bridge No. 13$13,22312 bids
- Foundation Preparation Pier 3$200,0007 bids
- Surface Seal, Bridge No. 1$4,660558 bids
- Surface Seal, Bridge No. 2$4,000390 bids
- Removal of Existing Bridge Structure (Site NO. 1)$32,500277 bids
- Present Structure, Remove Portions, Bridge No. 1$121,130223 bids
1 observation
1 agency in 1 state · lettings Aug 16, 2024
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.