Traffic816020
Dumped Riprap (Grouted) 18" Reinforced Concrete Pipe Culverts (Class Iii) 18" Smooth Lined Polymer Precoated Metallic Coated Corrugated Steel Pipe 24" Reinforced Concrete Pipe Culverts (Class Iii) Arkansas State Highway and Transportation Department Date: 11/04/13 Page: 060 -24 Tabulation of Bids Call Order: 060 Contract ID: 080390 Counties: Van Buren Letting Date: 10/30/13 10:30 a.M. District: 08 Line NO / Item Code / ALT Item Description Quantity 24" Smooth Lined Polymer Precoated Metallic Coated Corrugated Steel Pipe 30" Reinforced Concrete Pipe Culverts (Class Iii) 30" Smooth Lined Polymer Precoated Metallic Coated Corrugated Steel Pipe 36" Reinforced Concrete Pipe Culverts (Class Iii) 36" Smooth Lined Polymer Precoated Metallic Coated Corrugated Steel Pipe Inverted Profile Thermoplastic Contrast Pavement Marking White (4") High Performance Contrast Marking Tape White (4") Inverted Profile Thermoplastic Contrast Pavement Marking Yellow (4") Arkansas State Highway and Transportation Department Date: 11/04/13 Page: 060 -25 Tabulation of Bids Call Order: 060 Contract ID: 080390 Counties: Van Buren Letting Date: 10/30/13 10:30 a.M. District: 08 Line NO / Item Code / ALT Item Description Quantity High Performance Contrast Marking Tape Yellow (4")
One winning unit price
Single 1 winning bid$300/ CY
One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
- Letting
- Oct 30, 2013
- Quantity
- 13 CUYD
- Agency
- ARDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
What’s behind $300
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Create free accountHave one? Sign in
Email only — no card. Search and medians stay open without an account.
1Winning bid
1Agency
Oct 30, 2013Letting period
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ARDOT · Van Buren, Arkansas
- Letting
- Oct 30, 2013
- Quantity
- 13 CUYD
- Contractor
- Mobley Contractors, Inc.
- Winning price
- $300 / CY
1 observation
1 agency in 1 state · lettings Oct 30, 2013
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
1 rows, each with its source document. Sign in to open them.Create free account