Drilled Shaft Excavation, 5'-0" Diamete Alabama Department of Transportation Date: 07/25/08 Page: 010 -7 Tabulation of Bids Call Order: 010 Contract ID: 20080725010 Counties: Walker Letting Date: 07/25/08 10:00 AM Division: 03 Line NO / Item Code / ALT Item Description Quantity
One winning unit price
Single 1 winning bid$100/ LF
- Letting
- Jul 25, 2008
- Quantity
- 55 LF
- Agency
- ALDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Jul 25, 2008
- Quantity
- 55 LF
- Contractor
- Riley Bridge & Engineering Co., Inc.
- Winning price
- $100 / LF
What’s behind $100
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other earthwork items priced per LF, ranked by how much evidence each has.
- Drilled Shaft Excavation, 4'-0" Diamete$300224 bids
- Drilled Shaft Excavation, 3'-6" Diamete$253209 bids
- Drilled Shaft Excavation, 4'-6" Diamete$295127 bids
- Drilled Shaft Excavation, 5'-0" Diamete$30966 bids
- Drilled Shaft Excavation, 5'-6" Diamete$37258 bids
- Drilled Shaft Excavation, 3'-0" Diamete$20657 bids
- Drilled Shaft Excavation, 6'-6" Diamete$43723 bids
- Drilled Shaft Excavation, 7'-0" Diamete$55412 bids
1 observation
1 agency in 1 state · lettings Jul 25, 2008
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.