Detour Bridge at Station 63+29.00
Median lump-sum amount
Very thin 2 winning bids≈$229,500per contractLow confidence
- Winning bids
- 2
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 2 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Jun 27, 2014
- Quantity
- 1 LS
- Contractor
- THE Bridge Builders OF Alabama LLC
- Winning price
- $225,000 / LS
What’s behind $229,500
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 2 bids charted, so you can see clusters and outliers.
2 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other traffic items priced per LS, ranked by how much evidence each has.
- Erect and Remove Rolled Beam Detour Bridge$125,00011 bids
- Temporary Detour Bridge Number 001$504,9247 bids
- Traffic Monitoring Station System$86,425251 bids
- Sign Bridge Cantilevered (Structure)$27,800115 bids
- Sign Bridge NO. 1$125,00095 bids
- Bridge Mounted Sign Bracket NO. 1$10,00080 bids
- Sign Bridge (Structure)$51,37580 bids
- Detour Signing$6,50071 bids
2 observations
1 agency in 1 state · lettings Jun 27, 2014
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.