Decorative Stone, Meramec Rock (Chestnut Brown)
Median winning unit price
Thin 4 winning bids≈$303/ CYLow confidence
- Winning bids
- 4
- Source documents
- 4
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 4 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Jun 2, 2023
- Quantity
- 31 Cyd
- Contractor
- Hebert Construction Co.
- Winning price
- $307 / CY
Median by quarter
EstimatorHow this item has priced over time, quarter by quarter, from the same rows as the headline figure.
See what Estimator addsWhat’s behind $303
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 4 bids charted, so you can see clusters and outliers.
4 observations
Agency, county, letting date, quantity and the price as printed.
4 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other earthwork items priced per CY, ranked by how much evidence each has.
- Stone or Rock Ditch Checks$55.0078 bids
- Rock Excavation$58.00775 bids
- Rock Ditch Checks$60.00481 bids
- Excavation Rock$60.00409 bids
- Rock Slope Protection (60 LB, Class II, Method B) (Cy)$350353 bids
- Rock Slope Protection (20 LB, Class I, Method B) (Cy)$373301 bids
- Rock Slope Protection (150 LB, Class Iii, Method B) (Cy)$338223 bids
- Temporary Ditch Check (Rock)$98.50180 bids
4 observations
1 agency in 1 state · lettings Dec 2, 2016 – Jun 2, 2023
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.