Construction Requirements for Dam Protection Section Totals: $3,510,600.84 $3,513,169.88 $3,671,564.01
One winning bid
Single 1 winning bid$50,000per contract
- Letting
- Apr 14, 2020
- Quantity
- 1 LS
- Agency
- SCDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- SCDOT · South Carolina
- Letting
- Apr 14, 2020
- Quantity
- 1 LS
- Contractor
- National Bridge Builders, LLC
- Winning price
- $50,000 / LS
What’s behind $50,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other other items priced per LS, ranked by how much evidence each has.
- Construction Engineering$15,0003,453 bids
- Roadway Construction Control$35,000794 bids
- Grounding, Bonding, and Surge Protection$404170 bids
- Natural Resource Protection Plan$4,700150 bids
- Removing (Item Description) 01.$2,500101 bids
- Expansion Device (Structure) 01. B$25,00077 bids
- Pedestrian Control and Protection$3,55072 bids
- Environmental and Worker Protection$80,00068 bids
1 observation
1 agency in 1 state · lettings Apr 14, 2020
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.