Structures998A000LS · lump sum
Construction Fuel (Maximum Bid Limited to $ 387,500.00) Trainee Hours at 80 Cents per Hour Vehicular Impact Attenuator Assembly (Quadguard) (QS3004Y) (Bi-directional) Portable Impact Attenuator (Quadguard Bi-Directional)(QZ2403Y) Vehicular Impact Attenuator Assembly (Tracc Bi-directional) Portable Impact Attenuator (Tracc-wz Bi-directional) Contract Totals Alabama Department of Transportation Date: 12/18/00 Page: 033 -13 Tabulation of Bids Call Order: 033 Contract ID: 20001208033 Counties: Montgomery Letting Date: 12/08/00 10:00 AM District: 06 Set-aside: Line NO / Item Code / ALT Item Description Quantity
LSPriced per contract — not a unit price
One winning bid
Single 1 winning bid$82,550per contract
One winning bid, one job. This is what one contractor bid on one contract, not a market rate. There is no range and no distribution to show. Read the document below before carrying it.
- Letting
- Dec 8, 2000
- Quantity
- 1 LS
- Agency
- ALDOT
Winning bids only, as awarded. Nominal dollars. How we compute this
1Winning bid
1Agency
Dec 8, 2000Letting period
Where the number comes from
One of the 1 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Dec 8, 2000
- Quantity
- 1 LS
- Contractor
- W. S. Newell, Inc.
- Winning price
- $82,550 / LS
What’s behind $82,550
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 1 bids charted, so you can see clusters and outliers.
1 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Create free accountHave one? Sign in
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per LS, ranked by how much evidence each has.
- Surface Seal, Bridge No. 06$8,36047 bids
- Surface Seal, Bridge No. 10$6,45830 bids
- Surface Seal, Bridge No. 08$6,87528 bids
- Removal of Old Bridge, Station 10+00.00$40,00019 bids
- Surface Seal, Bridge No. 12$5,15517 bids
- Epoxy Injection, Furnishing Equipment, Bridge No. 06$88816 bids
- Clean Steel Bridge, QP-2, Bridge No. 06$93,61515 bids
- Paint Steel Bridge, Bridge No. 06$58,00013 bids
1 observation
1 agency in 1 state · lettings Dec 8, 2000
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
1 rows, each with its source document. Sign in to open them.Create free account