Conc Pavers, Rem and Salv
Median winning unit price
Moderate 8 winning bids≈$14.50/ SFLow confidence
- Winning bids
- 8
- Source documents
- 8
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 8 winning bids behind that median, with the agency’s own document one click away.
- Agency
- MDOT · Michigan
- Letting
- Feb 7, 2025
- Quantity
- 25 Sft
- Contractor
- Hoffman Bros., Inc.
- Winning price
- $48.00 / SF
Median by quarter
EstimatorHow this item has priced over time, quarter by quarter, from the same rows as the headline figure.
See what Estimator addsWhat’s behind $14.50
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 8 bids charted, so you can see clusters and outliers.
8 observations
Agency, county, letting date, quantity and the price as printed.
8 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other paving items priced per SF, ranked by how much evidence each has.
- Sidewalk, Brick Pavers, Rem and Salv$11.1217 bids
- Sidewalk, Clay Brick Pavers, Rem$5.00100 bids
- Reinstall Conc Pavers on Aggregate and Sand Bed$37.508 bids
- Reinstall Sidewalk, Brick Pavers on Conc and Sand Bed$30.006 bids
- Sidewalk, Brick Pavers on Conc and Sand Bed$20.616 bids
- Sidewalk, Brick Pavers, Install Salv, Type II$33.506 bids
- Sidewalk, Clay Brick Pavers, Rem, Modified$4.374 bids
- Sidewalk, Clay Brick Pavers, Salv$8.004 bids
8 observations
1 agency in 1 state · lettings Feb 21, 2020 – Feb 7, 2025
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.