Coating Existing Bridge at MP 0.229 Nbl; Bin# 010886
Median lump-sum amount
Thin 3 winning bids≈$135,000per contractLow confidence
- Winning bids
- 3
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 3 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- May 30, 2014
- Quantity
- 1 LS
- Contractor
- K.v.k. Contracting, Inc.
- Winning price
- $68,700 / LS
What’s behind $135,000
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 3 bids charted, so you can see clusters and outliers.
3 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per LS, ranked by how much evidence each has.
- Coating Existing Bridge at MP 297.515$3,514,5008 bids
- Coating Existing Bridge at MP 128.349 I-20/59 WBR Ramp$70,7526 bids
- Removal & Disposal of Existing Bridge$100,000634 bids
- Removal of Existing Bridge Structure (Site NO. 1)$32,500277 bids
- Remove Existing Bridge$125,000230 bids
- Removal of Existing Bridge Structure (Site NO. 2)$35,27080 bids
- Removal & Disposal of Designated Portions of Existing Bridge$70,00073 bids
- Clean Structural Steel (Existing Bridge)$316,60057 bids
3 observations
1 agency in 1 state · lettings May 30, 2014
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.