Clearing Unclassified Excavation Unclassified Bridge Excavation
Median lump-sum amount
Moderate 5 winning bids≈$75,522per contractLow confidence
- Winning bids
- 5
- Source documents
- 2
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 5 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Nov 2, 2012
- Quantity
- 1 LS
- Contractor
- Wright Brothers Construction Company, Inc.
- Winning price
- $75,522 / LS
What’s behind $75,522
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 5 bids charted, so you can see clusters and outliers.
5 observations
Agency, county, letting date, quantity and the price as printed.
2 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per LS, ranked by how much evidence each has.
- Excavation for Structures Bridges$12,0001,404 bids
- Removal & Disposal of Existing Bridge$100,000634 bids
- Surface Seal, Bridge No. 1$4,660558 bids
- Surface Seal, Bridge No. 2$4,000390 bids
- Bridge Construction Access$100,000368 bids
- Shoring or Extra Excavation CL. A$32,000296 bids
- Bridge Removal (Portion)$50,000294 bids
- Bridge Construction Control$35,700289 bids
5 observations
1 agency in 1 state · lettings Nov 6, 2009 – Nov 2, 2012
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.