Clearing & Grubbing (Approximately 2 Hectare) Unclassified Excavation Borrow Excavation (Loose Truckbed Measurement)(A4 or Better) Structure Excavation Foundation Backfill, Local Bituminous Treatment a
Median lump-sum amount
Thin 3 winning bids≈$7,500per contractLow confidence
- Winning bids
- 3
- Source documents
- 1
Winning bids only, as awarded. Nominal dollars. How we compute this
Where the number comes from
One of the 3 winning bids behind that median, with the agency’s own document one click away.
- Agency
- ALDOT · Alabama
- Letting
- Jan 28, 2000
- Quantity
- 1 LS
- Contractor
- MCD Construction Company
- Winning price
- $14,000 / LS
What’s behind $7,500
A free account opens the full build-up of this number, down to the agency documents it came from.
Middle-half range
The p25–p75 band of winning bids — where most jobs actually land.
Price distribution
All 3 bids charted, so you can see clusters and outliers.
3 observations
Agency, county, letting date, quantity and the price as printed.
1 public bid tabulations
Every row links to the agency’s own document. Check any price yourself.
Email only — no card. Search and medians stay open without an account.
Related items
Other structures items priced per LS, ranked by how much evidence each has.
- Excavation for Structures Bridges$12,0001,404 bids
- Prepare Foundation for Asphaltic$7,386572 bids
- Exc for Structure Bridges (Str$10,500407 bids
- Shoring or Extra Excavation CL. A$32,000296 bids
- Removal of Existing Bridge Structure (Site NO. 1)$32,500277 bids
- Present Structure, Remove Portions, Bridge No. 1$121,130223 bids
- Present Structure, Remove Portions, Bridge No. 2$91,720131 bids
- Present Structure, Remove, Bridge No. 1$150,000101 bids
3 observations
1 agency in 1 state · lettings Jan 28, 2000
| Letting | Agency · County | Quantity | Unit price | Source document |
|---|---|---|---|---|
Something wrong with this price? Report it — the form arrives knowing which item you mean.